logo

Guangzhou Xingjin Fire Equipment Co.,Ltd. info@xingjin-fire.com 86--18011936582

Guangzhou Xingjin Fire Equipment Co.,Ltd. Company Profile
products
Home > products > FK 5112 Fire Suppression System > Multi Zone Central Protection FK 5112 Fire Suppression System with 180L Cylinder Cuts Investment Cost

Multi Zone Central Protection FK 5112 Fire Suppression System with 180L Cylinder Cuts Investment Cost

Product Details

Place of Origin: Guangdong, China

Brand Name: Xingjin

Certification: CAL, CMA, CNAS, ILAC-MRA, CCC

Model Number: QMP180/5.6-FK-MZ8

Payment & Shipping Terms

Minimum Order Quantity: 2 sets

Price: USD 3,600 - 5,200 / Set

Packaging Details: Plywood case with bubble bag, cylinder bank fixed by steel bracket, manifold and valves packed separately

Delivery Time: 18-25 working days after deposit or L/C receipt

Payment Terms: T/T,L/C,Western Union

Supply Ability: 300 sets per Month

Get Best Price
Product Details
Highlight:

Multi Zone FK 5112 Fire Suppression System

,

180L Cylinder Fire Suppression System

,

Cuts Investment Cost Fire Suppression System

Agent:
FK-5-1-12 / Novec 1230 / C6F12O
Cylinder Volume:
180L (70L-150L Optional)
Working Pressure:
5.6 MPa At 20 C (4.2 MPa Optional)
Filling Density:
1080 Kg/m3 Or Less
Protected Zones:
Up To 8 Zones Per Unit
Protected Volume:
Up To 3600 M3 Total
Discharge Time:
10 Seconds Or Less To Selected Zone
Actuation Modes:
Automatic, Electrical Manual, Mechanical Emergency Manual
Residue:
None, Ventilation Only After Discharge
Working Temperature:
-10 C To +50 C
Agent:
FK-5-1-12 / Novec 1230 / C6F12O
Cylinder Volume:
180L (70L-150L Optional)
Working Pressure:
5.6 MPa At 20 C (4.2 MPa Optional)
Filling Density:
1080 Kg/m3 Or Less
Protected Zones:
Up To 8 Zones Per Unit
Protected Volume:
Up To 3600 M3 Total
Discharge Time:
10 Seconds Or Less To Selected Zone
Actuation Modes:
Automatic, Electrical Manual, Mechanical Emergency Manual
Residue:
None, Ventilation Only After Discharge
Working Temperature:
-10 C To +50 C
Product Description

Multi Zone Central Protection FK 5112 Fire Suppression System – Lower Investment Cost

One cylinder bank, one control panel and one selector valve manifold protect up to eight separate rooms with FK-5-1-12 clean agent. Instead of buying a complete system for every room, the central unit releases agent only into the zone that reports a fire, which cuts cylinder count, panel count and pipe work on multi-room projects.

How Central Multi Zone Protection Works

  • Detectors in every room report to one control panel.
  • The panel identifies the alarmed zone and opens the matching selector valve.
  • Agent flows from the shared cylinder bank to that zone only, reaching design concentration in 10 seconds or less.
  • Remaining zones stay fully charged and protected during and after the discharge.
  • Refilling is done on the central bank, not on eight separate cylinders.

Investment Cost Comparison

Cost item Separate systems per room Central multi zone unit
Cylinder banks One per room One shared bank
Control panels One per room One central panel
Cylinder room area Dedicated space per room Single storage area
Pipe work Repeated runs and penetrations One manifold plus short branches
Maintenance visits Inspection per system Single inspection covers all zones
Refill logistics Multiple cylinders to handle One bank to refill

Technical Specifications

Parameter Specification
Agent FK-5-1-12 / Novec 1230 / C6F12O
Cylinder volume 180L (70L, 90L, 100L, 120L, 150L available)
Working pressure 5.6 MPa at 20 °C (4.2 MPa optional)
Filling density ≤1080 kg/m³
Protected zones Up to 8 zones per unit
Protected volume Up to 3600 m³ total
Discharge time ≤10 seconds to the selected zone
Actuation Automatic, electrical manual, mechanical emergency manual
Power supply DC 24V / 1.6A
Residue None, ventilation only after discharge
Working temperature -10 °C to +50 °C
Certification CAL, CMA, CNAS, ILAC-MRA, CCC

Best Fit Projects

Office buildings with several server and telecom rooms, hospitals with equipment and imaging rooms, factories with separate control and electrical rooms, archive buildings with multiple storage compartments, and retrofit projects where a single cylinder room must serve the whole floor.

Scope of Supply

Seamless steel cylinder bank with FK-5-1-12 charge, cylinder valves, flexible hoses, combined distribution manifold, selector valves, nozzle pipe network, central control panel with zone indication, detectors, sounder and strobe, warning plates and installation manual. Zone count, bank capacity and pipe routing are engineered to the floor plan.